Friday, July 3, 2026
MediaNews4U
  • Exclusive
  • Advertising
  • Media
    • Radio
    • Cable & DTH
    • Print
    • Digital Frontier
    • Gaming Nexus
  • Television
  • OTT
  • Ad-Tech
  • Marketing
  • Campaigns
  • Analysis
  • Opinion
    • Opinion
    • Think Through
    • Prescience 2023
    • Prescience 2024
  • People
  • Events
    • Leader Speak
    • STRAIGHT TALK
    • Gamechangers
    • Print & TV Summit
MediaNews4U
  • Exclusive
  • Advertising
  • Media
    • Radio
    • Cable & DTH
    • Print
    • Digital Frontier
    • Gaming Nexus
  • Television
  • OTT
  • Ad-Tech
  • Marketing
  • Campaigns
  • Analysis
  • Opinion
    • Opinion
    • Think Through
    • Prescience 2023
    • Prescience 2024
  • People
  • Events
    • Leader Speak
    • STRAIGHT TALK
    • Gamechangers
    • Print & TV Summit
MediaNews4U.com
Home Featured

95% developers fear project delays due to 2nd COVID wave; Industry seeks urgent relief for recovery: CREDAI

by MN4U Bureau
June 10, 2021
in Featured, Marketing
Reading Time: 3 mins read
A A
First Ever CREDAI Report: 95% developers fear project delays due to 2nd COVID wave; Industry seeks urgent relief for recovery
Share Share ShareShare

Mumbai: The Confederation of Real Estate Developers’ Associations of India released findings of its first-ever industry survey conducted across North, East, West, and South zones between 24th May and 3rd June 2021, to assess the impact of the second wave of COVID-19 on real estate sector in India. Conducted with a stratified sampling method, the exploratory survey witnessed first-of-its-kind extensive participation of 4,813 developers from 217 cities, providing crucial insights on the industry sentiment and the range of challenges faced by the real estate sector.

According to the survey report, over 95% of developers feel inevitable project delays if no urgent relief measures are injected into the sector by the Government and RBI. These delays are attributed to a range of factors, with 92% of developers experiencing labor shortages at sites, 83% of developers are working with less than half the workforce, and over 82% of developers are facing project approval delays.

Remarking on the study outcomes, Harsh Vardhan Patodia, President, CREDAI National said, “The real estate sector showed tremendous resilience in bouncing back on a cautious recovery path post the first wave, despite little relief measures. However, the second wave has prompted us to reflect and re-evaluate the growth path of the industry, and we felt it was vital to assess the challenges faced by the customers and industry partners in light of the recent developments. The findings reveal that the second wave has had a more debilitating impact on the real estate sector than the first wave.”

Added factors such as a recent spike in construction materials including steel, cement, etc have contributed to a more than 10% increase in construction cost for more than 88% of developers. Various financial constraints and liquidity crunch are further adding to the problem, with 77% of developers experiencing issues in servicing of existing loans, 85% developers facing disruptions in the planned collection, and 69% are facing issues in the disbursement of customer home loans.

The survey findings by the apex body of real estate developers also put the spotlight on changing consumer behavior, resulting in a slowing of demand due to a decrease in inquiries and site visits. A staggering 98% of developers are facing reduced customer inquiries and 42% of developers are experiencing a 75% decline in customer inquiries. Furthermore, the report reveals that the second wave has caused 95% of customers to postpone their purchase decisions.

CREDAI’s Covid Impact Analysis Report is probably India’s most comprehensive and credible Real Estate Survey as it comes straight from developers across the nation and projects the ground reality. The impact analysis report will be shared with the concerned ministries and all relevant stakeholders.

“We have made a representation to the government citing the current survey and requesting the government to infuse urgent financial stimulus and initiate quick progressive measures to assist

recovery. As a part of our presentations, we have requested for liquidity infusion, one-time restructuring of loans, across the board 6 months extension of completion date by Rera, stamp duty reduction or waiver, moratorium extension on principal & interest for 6 months, and freezing of SMA classification for another year. We are hopeful that the government will consider our appeal and will make urgent interventions this time.” Harsh Vardhan Patodia, President, CREDAI National added.

The apex developers’ body also feels that reducing the cost of construction materials, implementing single-window clearances for project approvals and work commencement, and allowing an input tax credit for all sectors will help the business.

CREDAI deems that continued and adequate policy support is critical for the revival of the Indian economy, as the real estate sector accounts for 6–7% of GDP, is the second-largest employer, and is a business generator for over 270 ancillary industries in the country.

Tags: CREDAIHarsh Vardhan Patodia CREDAI

RECENT POSTS

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection
Marketing

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection

July 2, 2026
0

Mumbai: Homegrown performance apparel brand The Sock Street has appointed Indian wrestling champion and undefeated MMA athlete Sangram Singh as...

Read moreDetails
Himesh Reshammiya
Marketing

OnePlus ropes in Himesh Reshammiya for OnePlus N6 launch campaign

July 2, 2026
0

Bengaluru: Global technology brand OnePlus has partnered with music icon Himesh Reshammiya for the launch of its latest smartphone, the...

Read moreDetails
Instamart
Marketing

Instamart appoints Gautam Swaroop as Chief Business Officer

July 1, 2026
0

Bengaluru: Instamart, India's pioneering quick commerce platform, has appointed Gautam Swaroop as its Chief Business Officer (CBO), strengthening its leadership...

Read moreDetails
Sonu Sood
Marketing

Sonu Sood partners GetCompanion to raise awareness about India’s growing loneliness crisis

July 1, 2026
0

Mumbai: Actor and humanitarian Sonu Sood has partnered with emotional support platform GetCompanion to spotlight the growing issue of loneliness...

Read moreDetails
Ananta Capital acquires majority stake in Phitku, backs next phase of growth for science-led personal hygiene brand
Marketing

Ananta Capital acquires majority stake in Phitku, backs next phase of growth for science-led personal hygiene brand

July 1, 2026
0

Mumbai: Ananta Capital has acquired a majority stake in Phitku, the Made-in-India personal care and hygiene brand focused on body...

Read moreDetails
Flipkart turns viral buffalo ‘Don’ into face of new GOAT Sale Campaign
Marketing

Flipkart turns viral buffalo ‘Don’ into face of new GOAT Sale Campaign

June 30, 2026
0

Mumbai: Flipkart has launched a new campaign for its GOAT Sale, introducing an unconventional ambassador to drive attention around its...

Read moreDetails

LATEST NEWS

Mumbai Tak

Mumbai Tak hosts fourth edition of Mumbai Tak Baithak, brings together Maharashtra’s political and cultural leaders

July 2, 2026
Pranayavilasam

Zee Keralam to launch new fiction show ‘Pranayavilasam’

July 2, 2026

ANALYSIS

93% of APAC consumers walk away silently after losing faith in brands: Ogilvy
Analysis

93% of APAC consumers walk away silently after losing faith in brands: Ogilvy

July 2, 2026
0

Singapore: Ogilvy has unveiled its inaugural 2026 APAC Believability Index: The Power of Proof, a regional study examining how consumers...

PEOPLE

Shadma Shaikh
People

Shadma Shaikh joins CNA as South Asia Correspondent

July 2, 2026
0

Mumbai: Journalist Shadma Shaikh has joined CNA (Channel News Asia) as South Asia Correspondent, based in India. She will be...

MARKETING

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection
Marketing

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection

July 2, 2026
0

Mumbai: Homegrown performance apparel brand The Sock Street has appointed Indian wrestling champion and undefeated MMA athlete Sangram Singh as...

Subscribe to Newsletters

ADVERTISING

Rahul Dubey joins Publicis Sapient as North America Chief Growth Officer
Advertising

Rahul Dubey joins Publicis Sapient as North America Chief Growth Officer

July 2, 2026
0

New York: Publicis Sapient has named Rahul Dubey as its North America Chief Growth Officer, reinforcing its commercial leadership as...

PRINT

Mathrubhumi
Print

Mathrubhumi marks Reading Day with integrated campaign celebrating reading culture across media platforms

June 19, 2026
0

Kochi: Mathrubhumi has launched an integrated, multi-platform campaign to celebrate Reading Day and Reading Week, reinforcing its longstanding commitment to...

AUTHOR'S CORNER

How Real-Time Consumer Sentiment Is Reshaping Campaign Planning and Optimisation
Authors Corner

How Real-Time Consumer Sentiment Is Reshaping Campaign Planning and Optimisation

July 1, 2026
0

Campaign planning has already moved past the era of waiting for a quarterly brand tracker to find out how an...

UPLIFT MEDIANEWS4U DIGITAL PVT LTD
No. 194B , Aram Nagar 2, JP Road,
Versova, Andheri West
Mumbai - 400061

For editorial queries:
[email protected]
[email protected]

For business queries:
Smitha Sapaliga - +91-98337-15455
[email protected]

Recent News

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection

The Sock Street appoints Sangram Singh as Brand Ambassador, launches Compression Performance Gear collection

July 2, 2026
Mumbai Tak

Mumbai Tak hosts fourth edition of Mumbai Tak Baithak, brings together Maharashtra’s political and cultural leaders

July 2, 2026
Pranayavilasam

Zee Keralam to launch new fiction show ‘Pranayavilasam’

July 2, 2026

Newsletter

Subscribe to Newsletters

Medianews4u.com © 2019 - 2025 All rights reserved.

  • The South Side Story 2023 Download Report
  • Goafest 2023: Day 3
  • Goafest 2023: Day 2
  • Goafest 2023: Day 1
  • Straight Talk Gallery 2022
  • The South Side Story 2022 Download Report
  • Focus 2022
  • Futurescope Conclave Gallery 2022
  • The South Side Story 2021 Download Report
  • FOCUS 2021
  • Exclusive
  • Exclusive
  • Advertising
  • Media
    • Radio
    • Cable & DTH
    • Print
    • Digital Frontier
    • Gaming Nexus
  • Television
  • OTT
  • Ad-Tech
  • Marketing
  • Campaigns
  • Analysis
  • Opinion
    • Opinion
    • Think Through
    • Prescience 2023
    • Prescience 2024
  • People
  • Events
    • Leader Speak
    • STRAIGHT TALK
    • Gamechangers
    • Print & TV Summit

Medianews4u.com © 2019 - 2025 All rights reserved.